Skip to content
Alpha Edge Investing

Alpha Edge Investing

"Investors operate with limited funds and limited intelligence, they don’t need to know everything. As long as they understand better than others, they have an edge.” – George Soros

  • Home
  • Earnings Updates/ Corporate Actions
  • Research – Equities
  • Research – Fixed Income/ Bonds
  • Research – Unit Trust/ ETF
  • News
  • My Opinions/ Views
  • Others
  • About Me
  • Contact
  • Disclaimer
  • Community and Support Forums
  • Toggle search form

Moya wins tender to manage water system in Batam

Posted on June 20, 2022June 20, 2022 By alanyeo No Comments on Moya wins tender to manage water system in Batam


Goola Warden Fri, Jun 17, 2022

Moya Holdings Asia, in a consortium with PT Pembangunan Perumahan (Persero), has been awarded some that were put up for tender by Badan Pengusahaan Batam or BP Batam which is the Batam Free Trade Zone and Free Port Authority, an Indonesia government agency.

These projects include the operation and maintenance of the upstream water supply system and downstream water supply system in Batam. The projects will have a 15-year concession period after the handover date of operation and maintenance from BP Batam. The scope of the upstream project consists of the operation and maintenance of the production unit from six water treatment plants up to the bulk water delivery points, including the distribution pumps; operation and maintenance of the raw water facilities including basin, dam and auxiliary buildings as well as raw water transfer pump stations; and conservation of the raw water catchment area.

The scope of the downstream project consists of the operation and maintenance of the distribution pipe network from the bulk water delivery point in reservoirs to end costumers; and management of water loss.

For the purpose of each project, Moya and its consortium partner will establish two joint ventures in Indonesia, with Moya having a 60% stake.

At present, the water supply system in Batam has around 291,000 customers, served by six water treatment plants, with total capacity of 3,600 litres per second and more than 4,200 kilometres pipe network, serving the 1.3 million population in Batam.

Moya says it expects the projects to further expand and strengthen its business in the water treatment industry in Indonesia. The projects are not expected to have any material impact on the consolidated net tangible assets per share and earnings per share for the year ending Dec 31, 2022.

Share this:

  • Click to share on Twitter (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)
Earnings Updates/ Corporate Actions, News Tags:Moya

Post navigation

Previous Post: Ausgroup plans to divest property for A$16.2 million
Next Post: STI breaks support, may stay volatile

Leave a Reply

You must be logged in to post a comment.

Login

Log In
Register Lost Password
Get new posts by email
Chat on WhatsApp
  • Earnings Updates/ Corporate Actions
  • My Opinions/ Views
  • News
  • Others
  • Research – Equities
  • Research – Fixed Income/ Bonds
  • Research – Unit Trusts/ ETF

Copyright © 2023 Alpha Edge Investing.

Powered by PressBook Grid Blogs theme